Production of the injection block
When the multifunctional tape has risen and the joint is closed, the Hanno injection block can be injected into the
multifunctional tape.
Select the corresponding points/areas in which the injection block is to be placed. Ensure that
the window reveal in these areas is firm and load-bearing so that it can support the loads from the window.
Inject the amount of resin required for the joint width distributed over at least three injections at intervals of approx.
15 mm. Please determine the required resin quantity for spacer blocks and load-bearing support blocks using the statics and injection quantity tool or for spacer blocks without required load transfer using the following tables.
Note: If you do not know which table is the correct one, simply compare the hinge size of your hinge with the hinge sizes from the tables.
Table 3E tapes19 KB
Table 3E BG121 KB
Table 3E Easy21 KB